![]() |
|
>![]() |
![]() |
【Delivery】Delivery for Two Units of 4020kW ASD TugboatOn 17th of July,2023, Two Units of 4780kW ASD Tugboat --“CAO GANG 30” “CAO GANG 31” Which were built for Tangshan Caofeidian Shipping Co., Ltd by our shipyard have been delivered and sailed smoothly. The tugboat’s overall length is 35.93m, the molded lines is 34.7m, the width is 11.1m, the depth is 5.23m, ahead bollard pull is 81.3t and astern bollard pull is 73.2t, and the speed is 13.1Kn. |
Copyright
(C) 2010-2025 zjshipyard.com. All Rights Reserved
ddress:No.8 Jingjiang Road ZhenJiang City Jiangsu Province Tel:0086-511-85637101 85637218 Fax:0086-511-85637107 |